Initial Tests of UK90 Hall Thruster
Initial tests of the UK90 Hall thruster are conducted. This 90mm diameter discharge chamber Hall thruster employs an LaB6 central cathode. The first picture shows the thruster in operation inside the BUSTLab vacuum chamber. The second picture shows the view of the thruster from one of the windows of the BUSTLab vacuum chamber.


Other Announcements
UK90 Hall Thruster is Ready for Tests
Assembly of UK90 Hall Thruster is Almost Complete
Standard Coil Antenna and Ferrite Core Antenna RF Plasma Cathodes are Tested
ICIS-2017
IEPC-2017
Longer Coaxial-Heater Hollow Cathode is Tested
MET is operated with Nitrogen
